More ride prep done last night...
- Rear gear fluid changed (almost no metal "fuzzies" on the drain magnet - yay!)
- Oil drained, flushed, refilled (oil be getting expensive!)
- Oil filter replaced
- Air filter replaced
- Burned out bulb replaced - new one is a dud. :(
- Electrical work started
Tonight I have other commitments so I probably won't do much, but I've really only got a few things left...
- Install comm system and wire up the wife's helmet
- Install Ram Mounts for CB and a few other gadgets
- Run a power line for the CB
- Flush brake and clutch fluid (maybe - that's a beast of a job when you've got an ABS system).
Then, it's packing and getting ready to roll. :)