FJR ride Prep - Stage 2

by smthng 15. July 2008 07:55

More ride prep done last night...

  • Rear gear fluid changed (almost no metal "fuzzies" on the drain magnet - yay!)
  • Oil drained, flushed, refilled (oil be getting expensive!)
  • Oil filter replaced
  • Air filter replaced
  • Burned out bulb replaced - new one is a dud. :(
  • Electrical work started

Tonight I have other commitments so I probably won't do much, but I've really only got a few things left...

  • Install comm system and wire up the wife's helmet
  • Install Ram Mounts for CB and a few other gadgets
  • Run a power line for the CB
  • Flush brake and clutch fluid (maybe - that's a beast of a job when you've got an ABS system).

Then, it's packing and getting ready to roll. :)

Be the first to rate this post

  • Currently 0/5 Stars.
  • 1
  • 2
  • 3
  • 4
  • 5

Tags: , , , , ,

blog | Trips

Add comment


(Will show your Gravatar icon)  

  Country flag

biuquote
  • Comment
  • Preview
Loading



Powered by BlogEngine.NET 1.4.5.0
Theme by Mads Kristensen

About smthng

Just a guy who digs Jeeps, photography, podcasts, sci-fi, running, motorcycles, and stuff.

Tags